RIBA Work Stages |
Fee |
Activity |
 |
A |
 |
Appraisal |
|
£65.00 per hour |
Identify and clarify project objectives and determine the best way of proceeding. |
B |
 |
Design Brief |
|
Option Appraisal / Feasibility Study Identify constrains and key requirements. |
 |
C |
 |
Concept |
|
30% of the fee |
Outline design / Prepare Project Programme / Identify requirement for additional consultants. |
D |
 |
Design Development |
|
|
Receive design/cost input and develop design solutions. Planning Application |
E |
 |
Technical Design |
|
20% of the fee |
Consult statutory authorities (and others) on developed design proposals as necessary. |
 |
F |
 |
Production Information |
|
25% of the fee |
Prepare co-ordineated production information. Identify and complete outstanding production information. |
G |
 |
Tender Documentation |
|
Issue production information for preparation of tender pricing document and pre-tender estimate. |
H |
 |
Tender Action |
|
25% of the fee |
Provide tender documents. Assitst with appraisal of tenders and any negotiations with authorised tenderers. |
 |
J |
 |
Mobilisation |
|
Provide and issue production information. Brief site inspectorate. |
K |
 |
Construction to Practical Completion |
|
Make site visits and report to Contract Administrato. Receive specified data from contractor. incorporate in Building Owner's Manual. |
 |
L |
 |
Post Practical Completion |
|
Make pre-final inspection and schedule of defects and incomplete works. Advice on action for defects. Make final inspection. |